English Electric Co., Stafford

Move your pointing device over the image to zoom to detail. If using a mouse click on the image to toggle zoom.
When in zoom mode use + or - keys to adjust level of image zoom.

Date:1940 - 1945 (c.)

Description:Pictured is the Over-speed Test Building on English Electric Co.'s Lichfield Road site in Stafford.

Over the years this facility has been used to test rotors manufactured by the English Electric Co. and later by GEC and Alstom to confirm the rotor's mechanical integrity.

The walls of the Over-speed Test tunnel are incredibly strong. Before testing a Rotor commenced, the heavy sleepers hanging on rails on each side of the archway would be pulled across the tunnel’s entrance. These would absorb kinetic energy in the case of a test failure. In later years the building was re-clad and is still in use (May 2014).

This image is taken from a glass negative donated to the Staffordshire County Museum by Alstom Power, Lichfield Road, Stafford.

Siemens Brothers purchased the land in 1901 and built the factory and offices which were ready to start production in 1903. In 1918 Siemens merged with several companies, including Dick, Kerr and Co., to become the English Electric Co. Two years later in 1920, The English Electric Co bought the Stafford Works. The English Electric Co merged with GEC (The General Electric Company) during 1968 and the Lichfield Road Site became part of GEC Power Engineering Ltd. On 22 March 1989 became part of GEC ALSTHOM, an Anglo French Joint Venture. On 22 June 1998 became part of ALSTOM with global HQ in Paris and to date (May 2014) continues to be part of the ALSTOM Group.


Timeline

The timeline shows resources around this location over a number of years.

1930s
English Electric Co., Stafford Works Ambulance
English Electric Co., Stafford Works Ambulance

Pictured is the English Electric Co. Daimler ambulance at the Lichfield Road site ...

1960s
English Electric Co., Stafford, Annual Fire Brigade Competitions
English Electric Co., Stafford, Annual Fire Brigade Competitions

One of the Fire Brigade teams is pictured preparing hoses to aim at the competition ...

1980s
GEC Turbine Generators Ltd., Stafford
GEC Turbine Generators Ltd., Stafford

On the left facing the photographer is Peter Marsden and on the right Alan Smith ...

Share:


Ordering:Click the button to add the item to your basket. Follow the link for further information on ordering.

Creators: Mr Andy Ellis, Alstom Power, Stafford - Contributor

Donor ref:P2015_004_0049 (37/27229)

Source: Staffordshire Museum Service

Copyright information: Copyrights to all resources are retained by the individual rights holders. They have kindly made their collections available for non-commercial private study & educational use. Re-distribution of resources in any form is only permitted subject to strict adherence to the usage guidelines.